What to Expect During a Full Roof Replacement in South West London
Replacing a roof is one of the biggest home improvements a property can need. For homeowners in South West London, the process can feel daunting: there is scaffolding to arrange, materials to choose, and a team of roofers working overhead for days or weeks. Knowing what happens at each stage helps you plan, ask the right questions, and avoid surprises.
Below is a plain-language walkthrough of a typical residential roof replacement. Every job is different, but the sequence of steps stays largely the same. The details given here apply to most pitched roofs with traditional slate or tile coverings. If your roof is flat, or if you have a different material such as thatch or metal, some steps will differ.
Resilient Roofing Ltd is also on Instagram.
Step 1: The initial roof survey and quotation
Nothing happens until a professional has seen the roof. A surveyor or roofing contractor will visit your property, inspect the roof from ground level, and often climb up to examine the structure up close. They look for rotten timbers, damaged underlay, slipped tiles, and signs of water ingress. On a terraced or semi-detached house they may also check the party wall area and the condition of the chimney stack if one is present.
After the survey the contractor provides a written quotation. This should itemise the work: stripping the old covering, replacing any faulty timber, fitting new underlay, fixing new tiles or slates, and dealing with flashings, valleys, and ventilation. Ask for a breakdown of costs so you can see where the money goes. Most reputable firms in South West London offer free, fixed-price quotes. If a quote seems vague or unusually cheap, treat it with caution.
Step 2: Building regulations and planning permission
Most roof replacements do not need planning permission. You are replacing what is already there, not changing the shape or size of the roof. However, there are exceptions. If you are altering the roof structure, adding dormer windows, or changing the roof pitch, you may need permission. The same applies if your house is listed or in a conservation area. Your contractor should advise you, but it is wise to check with the local planning authority yourself.
Building regulations do apply. A new roof must meet current standards for insulation, ventilation, and structural strength. The contractor should arrange the necessary building control approval. This usually involves a visit from a building inspector partway through the job and a final certificate once the roof is finished. An insurance-backed guarantee, such as those offered by many established contractors, can give extra peace of mind if any defect appears later.
Step 3: Scaffolding and site preparation
A full roof replacement requires scaffolding. The scaffold goes up a day or two before work starts and stays until the roof is weathertight and the gutters and fascias are finished. The scaffolding must be erected by a qualified team and should comply with health and safety regulations. Your contractor will typically include the cost in the quotation.
On the day of setup, the contractor will also protect your garden and driveway. Expect dust sheets, tarpaulins, and a skip or dumpster for the old roof materials. Make sure your bins, cars, and fragile plants are moved clear of the work area. The noise from stripping tiles and hammering will be loud, so warn neighbours and consider working from home if you can.
Step 4: Stripping the old roof
With the scaffold in place, the roofers start stripping. They remove every tile or slate, the felt or underlay, and the wooden battens that held the covering in place. Old lead flashings around chimneys and valleys are usually taken off too. This stage creates a lot of debris, which is thrown into the skip or lowered to ground level.
Watch for: the condition of the roof timbers underneath. Once the covering is off, the underlying rafters, ridge beam, and purlins are exposed. Any rot, woodworm, or damage from a previous leak becomes visible. A good contractor will point this out and discuss repairs before moving on. Do not let them start the new covering until any rotten timber has been replaced or repaired.
Step 5: Structural repairs and ventilation upgrades
This is the time to fix the roof structure. Rotten rafters are cut out and new timber spliced in. Loose or sagging sections are strengthened. If your roof has no ventilation or poor airflow, the contractor may install ridge vents, soffit vents, or tile vents. Proper ventilation prevents condensation in the roof space, which can lead to damp and rot over time.
Building regulations now require a minimum level of insulation at rafter level. The contractor may fit insulation between and over the rafters, using a vapour control layer and a breathable membrane. This is a good moment to talk to your contractor about improving your home's energy performance. Better insulation can make your home warmer in winter and cooler in summer, and may reduce heating bills.
Step 6: New underlay and battens
Once the structure is sound, the roofer lays a new underlay. Modern breathable membranes let moisture escape from inside while keeping rain out. The underlay is draped over the rafters and fixed with battens. The battens are horizontal strips of treated timber that hold the tiles or slates. They must be nailed at the correct gauge (spacing) to match the size of the tile or slate being used.
At this stage the contractor also fits new lead flashings to the chimney, valleys, and any roof penetrations such as soil vents or flues. Lead is still the preferred material for these areas because it lasts decades and can be shaped to fit complex junctions. If your contractor suggests a substitute, ask why.
Step 7: Fitting the new roof covering
Now the visible part of the new roof goes on. The roofer starts at the eaves and works upward, laying tiles or slates in overlapping rows. Each tile is nailed or clipped to the battens. The ridge at the top is finished with ridge tiles or a dry ridge system that allows ventilation.
If you are choosing the material yourself, consider the weight, colour, and durability. Clay tiles, concrete tiles, natural slate, and man-made slates each have different lifespans and price points. Ask your contractor what they recommend for your area. South West London has many Victorian and Edwardian houses, so matching the local character often adds value.
During this phase, the roofers will also fit any roof windows, skylights, or solar panel brackets if those are part of the project. Make sure these are installed by a competent person and that the flashings around them are watertight.
Step 8: Gutters, fascias, and soffits
With the roof covering in place, the contractor turns to the edges. Old fascias and soffits are replaced. Gutters and downpipes are renewed or cleaned out. This is a good opportunity to upgrade to larger gutters if your property has suffered from overflowing in heavy rain. The contractor may also fit leaf guards or a gutter protection system.
Fascias (the boards behind the gutter) and soffits (the underside of the eaves) are often made of uPVC or timber. uPVC is low maintenance, while timber can be painted and may look more traditional. Your contractor can advise on the best choice for your house.
Step 9: Final inspection and sign-off
Once the roof is finished, the contractor should carry out a final inspection. They check that all tiles are secure, the flashings are properly dressed, and the gutters run freely. If building regulations were involved, the building inspector visits to confirm the work meets the required standards. You receive a certificate of compliance.
Most reputable contractors also provide a guarantee on the workmanship. An insurance-backed guarantee means that if the company ceases trading, the guarantee is still valid. For homeowners in South West London, this kind of protection is worth asking about before the job starts. A family-run business such as Resilient Roofing Ltd, with a Chartered Architectural Technologist overseeing the work, can give you confidence that the project is managed properly from start to finish.
Step 10: Aftercare and maintenance
A new roof should last 50 years or more, but it still needs occasional attention. Check the roof after storms and in spring. Look for lifted tiles, blocked gutters, or moss growth. Trim overhanging branches that could scrape the surface. If you notice a leak inside, have it investigated quickly. Early repairs prevent bigger problems.
Your contractor may offer an annual maintenance inspection. If not, a local roofing company can do it for a modest fee. Keep the paperwork from the replacement: the guarantee, the building regulations certificate, and the invoice. These documents are useful if you ever sell the house.
For more information about roof replacement, or to arrange a survey, contact Resilient Roofing Ltd at 31 Devonshire Road, Colliers Wood, London SW19 2EJ, UK, or call +44 20 8175 7033.